3N0/3NK/3PD/3PG
2-3-13
YC2
1
BRIDGE_LED_A
O
3.3 V DC
3.3 V DC power output to BRCS1
Connect to
the BR
conveying
sensor 1, BR
conveying
motor
2
GND
-
-
Ground
3
BRIDGE_SENS 1
I
0/3.3 V DC
BRCS1: On/Off
4
SMOT_B2
O
0/24V DC (pulse)
BRCM drive control signal
5
SMOT_A2
O
0/24V DC (pulse)
BRCM drive control signal
6
SMOT_B1
O
0/24V DC (pulse)
BRCM drive control signal
7
SMOT_A1
O
0/24V DC (pulse)
BRCM drive control signal
YC4
1
COVER_OPEN
I
0/3.3 V DC
BRECSW: On/Off
Connect to
BR
conveying
cover switch,
BR
conveying
sensor 2
2
GND
-
-
Ground
3
BRIDGE_LED_A
O
3.3 V DC
3.3 V DC power output to BRCS2
4
GND
-
-
Ground
5
BRIDGE_SENS 2
I
0/3.3 V DC
BRCS2: On/Off
Connector
Pin
Signal
I/O
Voltage
Description
Summary of Contents for AK 740
Page 1: ...Service Manual RFXPHQW LQLVKHU D 07 3 LUVW GLWLRQ Date 2 0 20 3 SM06 ...
Page 2: ...Service Manual RFXPHQW LQLVKHU D 07 3 LUVW GLWLRQ Date 2 0 20 3 SM06 ...
Page 4: ...Revision history Revision Date Pages Revised contents ...
Page 5: ...This page is intentionally left blank ...
Page 11: ...This page is intentionally left blank ...
Page 17: ...3N0 3NK 3PD 3PG 1 1 4 2 Mail box option Figure 1 1 2 1 2 1 Trays 1 7 2 Mailbox cover ...
Page 29: ...3N0 3NK 3PD 3PG 1 2 10 This page is intentionally left blank ...
Page 45: ...3N0 3NK 3PD 3PG 1 3 16 This page is intentionally left blank ...
Page 129: ...3N0 3NK 3PD 3PG 2 2 9 This page is intentionally left blank ...
Page 155: ...1 1 INSTALLATION GUIDE DF 791 3000 sheet finisher Installation Guide ...
Page 170: ...AK 740 Bridge unit Installation Guide ...
Page 172: ...MT 730 B Mail box Installation Guide ...