should not be fed in the heating area (boiler room), smoke and food and beverage that may be
affected should not be stored.
All electrical and water installations must be done by authorized plumbers, in accordance with any
applicable legal and technical rules, approved by the relevant legal entities. The fuels to be burned in
the boiler should be kept in a way to maintain a distance of at least 800 mm from the boiler. It is
recommended to store fuels in a separate location.
Boilers should be installed on a concrete base at a height of 10 cm from the floor to protect water
from moisture and solid fuel from ash dust. The concrete base prevents the fan from absorbing fuel
or ash dust on the ground. Laying the mounting place with tiles and tile stones makes cleaning easier.
It is inconvenient to keep flammable, burning and easily flammable substances in the
boiler room.
Mounting location dimensions:
The boiler room should be sized to provide the minimum dimensions given in the picture below.
While placing the boiler, it is necessary to leave sufficient distance for the fuel to be added to the
hopper easily, the gearmotor and shaft under the hopper can be easily removed, and the service can
work comfortably.
Dimension A: 60 cm more than the opening of the boiler cover;
Dimension B: Must be selected taking into account the shaft disassembly distance.
If the above measurements are complied with, the minimum 8 m
3
volume requirement given in the
regulations is ensured.
There should be no faulty electrical line in the boiler room..
The 230 V electrical connection from the control panel must be connected to the mains
via the W automat.