SELECTION of INSTALLATION PLACE 

 
The place where the boiler is installed must have enough free space for the installation, burning and 
maintenance  of  the  boiler.  For  the  service  need,  the  gearbox  and  the  group  to  which  the  shaft  is 
connected  should  be  distant  from  the  wall  to  easily  come  out.  For  this,  the  dimensions  in  the 
paragraph titled “Mounting location dimensions” should be applied. 
 
In addition, there should be a sufficient amount of clean air circulation for efficient combustion, the 
chimney  design  must  meet  the  required  draft  values  for  the  model  used  and  comply  with  the 
construction criteria and related regulations given in the manual. The boiler should never be installed 
in  open  spaces,  balconies,  living  areas  (kitchen,  living  room,  bathroom,  bedroom),  in  places  with 
explosive and easily flammable materials. 
 
The  door  of  the  boiler  room  should  not  be  opened  directly  to  the  escape  staircase  or  general  use 
stairs and must be opened to a security hall. There should be at least one door in boiler rooms with 
thermal capacities between 50 kW and 100 kW, and at least 2 exit doors in boiler rooms with a floor 
area over 100 m

2

. The exit doors should be placed in the opposite direction of each other as much as 

possible,  they  should  be  resistant  to  fire  for  at  least  90  minutes,  smoke-tight  and  capable  of  self-
closing. 
 
At least one of the doors must open directly outside and outside the building. If it is possible to open 
a door directly outside the building from the boiler room, this is the most suitable solution. The door 
of the  boiler  room  should not  be  opened  directly  to the  escape  staircase or  general  use  staircases 
and must be opened to a common hallway or corridor. 
 
A threshold of at least 10 cm height is recommended for the doors opening from the boiler room into 
the  building.  If  it  is  possible  to  illuminate  the  boiler  room  naturally,  it  should  be  noted  that  the 
lighting  openings  do  not  come  under  other  windows  of  the  building.  If  artificial  lighting  is made,  a 
system that does not dazzle but brightens the apartment should be installed. The main switches and 
panels belonging to the boiler room should be placed around the entrance door and should be leak-
proof type. A fire tube must be kept in the boiler rooms. 
 
One of the purposes of placing the boiler on the concrete base in the boiler room is to prevent the 
fan from sucking dust from the floor. Ventilation can be done naturally or algebraically. It should be 
ensured  that  the  fresh  air  inlet  chimney  mouth  is  at  the  ground  level  and  the  dirty  air  tapping 
chimney mouth is at the ceiling level. 
 
At least 1 6 kg multi-purpose dry chemical powder extinguishing device should be kept in the boiler 
room. If natural gas or liquid fuel boilers are also used in the same boiler room, the tear surface must 
be designed. 
 
The  established  place  must  have  grilles  which  are  directly  connected  to  the  external  environment 
and  allow  fresh  air  to  enter.  One  of  the  culverts  should  be  at  most  40  cm  below  the  boiler  room 
ceiling and the other should be at most 50 cm above the floor. These culverts should be constantly 
open. The lower grill must be at least 40 x 40 cm and the top grill must be at least 30 x 30 cm. Pets 

Summary of Contents for UKY/DUOPEL 100

Page 1: ...KY Duopel Boilers User Manual NL SOY Yap Malzemeleri Sanayi ve Ticaret Ltd ti Pancar Organize Sanayi B lgesi 2 Etap No 2 Torbal ZM R TURKEY Tel 90 444 35 32 Fax 90 232 469 2412 www unmak com...

Page 2: ...OTICES 6 ELECTRIC INSTALLATION INSTRUCTIONS 8 INFORMATION ABOUT COMBUSTION 10 BOILER FEAUTURES 12 RULES FOR HEATING INSTALLATION 14 CONTROL PANEL AND USER INTERFACE 17 START UP 19 FUEL FEEDING STANDBY...

Page 3: ...ting heating installations not directly for domestic water heating However it can produce hot tap water with the help of a boiler or heat exchanger The energy required for potable water will be taken...

Page 4: ...a sufficient capacity In order not to damage the boiler outer sheets and the boiler during transportation While carrying the rope on the forklifts on the chassis and carrying the boiler with the help...

Page 5: ...the boiler room this is the most suitable solution The door of the boiler room should not be opened directly to the escape staircase or general use staircases and must be opened to a common hallway or...

Page 6: ...d Laying the mounting place with tiles and tile stones makes cleaning easier It is inconvenient to keep flammable burning and easily flammable substances in the boiler room Mounting location dimension...

Page 7: ...himney walls should not be less than the thickness of a brick Hollow brick and briquette should never be used in chimney construction It should be plastered inside and outside and cylindrical pipe ins...

Page 8: ...ure that the proportion between the installation water flow rate and the boiler power and the 20 C difference between the boiler inlet and outlet water temperatures are not exceeded To minimize the co...

Page 9: ...ate hot dip or c Solid copper rod should be made with electrodes Copper rod electrodes must be at least 1 5 m in diameter of 16 mm or at least 1 25 m in diameter of 20 mm and the earthing resistance o...

Page 10: ...P a g e 9 KY Duopel Boilers User Manual Elektrik Ba lant emas...

Page 11: ...1 4 of the chimney height The height of the chimney should be determined well and the chimney rising from the building should rise at least 80 cm from the ridge Unless compulsory the chimney sections...

Page 12: ...1 meter above flat roofs and at least 0 4 meters above tiled roofs Excess air at high flue temperature high flue temperature also causes loss of combustion efficiency Excess air causes high flue temp...

Page 13: ...llation from this pipe 5 Return line It is the pipe through which the water returned from the radiators or heating installation returns to the boiler It can also be called return pipe or return line 6...

Page 14: ...510 585 Draft Pa 25 28 31 33 33 35 35 40 Temperature Control Range o C 40 90 Return Temperature Recommended o C 40 Maximum Operation Pressure bar 3 Test Pressure bar 5 Dimensions Boiler Width A mm 10...

Page 15: ...he dispensing system to collect the expanding water volume The water expanding in the boiler is stored in the expansion tank through the flow safety pipe When the water in the installation cools the r...

Page 16: ...P a g e 15 KY Duopel Boilers User Manual Open expansion tank installation scheme...

Page 17: ...orrectly to minimize the addition of fresh water None of the materials used in the installation should be gas permeable Maximum 50 micron filter with synthetic or metal mesh should be placed on the fr...

Page 18: ...nto the device It is used to increase or decrease the values of Fan Setting Temperature Setting Fuel Supply and Fuel Standby ENTER It is used for storing the set values and for entering submenus from...

Page 19: ...is activated and deactivated with this button Manuel Fuel Feeding It is used to manually manually add fuel to the boiler As long as the button is pressed fueling continues Wood Mode It is used when i...

Page 20: ...ic feeding Fill the hopper with wood pellet and close the cap tightly Open the control panel by pressing the ON OFF button of the device for 1 second When turned on values will appear next to Feed Set...

Page 21: ...remain at Level 1 during the ignition Find the Fuel Feed and Fuel Standby settings in the Fuel Standby Feed Settings section of your manual which should be based on the boiler power and fuel type Pre...

Page 22: ...en You can hold down the buttons until the temperature level you want to adjust When it reaches the desired degree you can save it by pressing the ENTER button Press the Fan Setting button of the pane...

Page 23: ...ording to the chimney draft and the thermal comfort demand of the space In power cuts close the flue flap if any If the pump bypass line is available activate the line When the electricity comes do no...

Page 24: ...ash collected between the blades of the fan it is necessary to clean it by blowing or holding a dryer without disturbing the blades of the fan Cleaning the boiler It should be done when the boiler is...

Page 25: ...of plastic derivative into the boiler or fuel reservoir hopper Check that there are no holes or cracks in the chimney If you still can t consult your leg Have your chimney sealed Excessive fuel consum...

Page 26: ...e If using automatic add fuel to the hopper manually load fuel if mechanical feeding is used Replace probe or call service Replace probe or call service If using automatic add fuel to the hopper if us...