M12927CA
CONNECTIONS DIAGRAM
Probe connection:
•
PT1000/NTC/PTC
: between terminal 3 and 2
•
PT 100
: between terminal 3 and 2 with terminal 1
•
Passive pressure probe
0/4-20 mA: between terminal 4 ( + ) e 1 ( - )
Note: out4 must be activated ( IO4F must be setted to ON )
•
Powered pressure probe
0/4-20 mA between terminal 4 (power supply), 2 ( negative) e 1 (positive)
Note: set IO4F to ON to activate Out4
Power supply connection:
•
Neutral wire:
terminal 9
•
Phase:
terminal 10 ( 100…240 Vac )
•
Close terminals 15-16 to switch to the set point 2
Output connection:
•
Channel 1:
terminal 7 and 8 ( burner on – off )
•
Channel 2:
terminal 11 and 12 (servomotor opens)
•
Channel 3:
terminal 13 and 14 (servomotor closes)
4
Summary of Contents for KPBY70
Page 33: ...PART III OPERATION 33 FLUIDICS 12AG 90Kg h...
Page 53: ......
Page 54: ......
Page 55: ......
Page 57: ...Service manual AZL2x LMV2x 3x Burner Management System M12916CD Rev 3 4 03 2023...
Page 64: ...8 Parameters level heating engineer...
Page 106: ...50 ERROR CODE TABLE...
Page 107: ...51...
Page 108: ...52...
Page 109: ...53...
Page 110: ...54...
Page 111: ...55...
Page 112: ...56...
Page 113: ...57...
Page 114: ...58...
Page 115: ...59...
Page 116: ...60...
Page 117: ...61...
Page 118: ...62...
Page 119: ...63...
Page 120: ...64...
Page 125: ......
Page 126: ......
Page 127: ......
Page 142: ......
Page 151: ......
Page 152: ......
Page 153: ...RWF50 2x RWF50 3x User manual M12922CB Rel 1 0 07 2012...
Page 168: ...16 Note Specifications and data subject to change Errors and omissions excepted...
Page 169: ...KM3 Modulator USER MANUAL M12927CA Rel 1 0 10 2020...
Page 170: ...M12927CA MOUNTING 2...