PART II: INSTALLATION
17
Siemens VGD valves with SKP actuator
:
The pressure adjusting range, upstream the gas valves group, changes according to the spring provided with the valve group.
Caution: the SKP2 diaphragm D must be vertical (see Fig. 16).
WARNING: removing the four screws BS causes the device to be unserviceable!
Fig. 13
Fig. 14
Fig. 15
Performance range (mbar)
0 - 22
15 - 120
100 - 250
Spring colour
neutral
yellow
red
ATTENTION:
once the gas train is mounted according to the diagram on Fig. 4, the gas proving test mus be performed,
according to the procedure set by the laws in force.
BS
BS
SKP1.
SKP2.
BS
BS
SA
SA
TP
D
7631z05/0101
SIEMENS VGD..MOUNTING
POSITIONS
2
(cap)
1
(spring)
Fig. 16
Summary of Contents for KPBY70
Page 33: ...PART III OPERATION 33 FLUIDICS 12AG 90Kg h...
Page 53: ......
Page 54: ......
Page 55: ......
Page 57: ...Service manual AZL2x LMV2x 3x Burner Management System M12916CD Rev 3 4 03 2023...
Page 64: ...8 Parameters level heating engineer...
Page 106: ...50 ERROR CODE TABLE...
Page 107: ...51...
Page 108: ...52...
Page 109: ...53...
Page 110: ...54...
Page 111: ...55...
Page 112: ...56...
Page 113: ...57...
Page 114: ...58...
Page 115: ...59...
Page 116: ...60...
Page 117: ...61...
Page 118: ...62...
Page 119: ...63...
Page 120: ...64...
Page 125: ......
Page 126: ......
Page 127: ......
Page 142: ......
Page 151: ......
Page 152: ......
Page 153: ...RWF50 2x RWF50 3x User manual M12922CB Rel 1 0 07 2012...
Page 168: ...16 Note Specifications and data subject to change Errors and omissions excepted...
Page 169: ...KM3 Modulator USER MANUAL M12927CA Rel 1 0 10 2020...
Page 170: ...M12927CA MOUNTING 2...