Operating Manual for UTD2000/3000
5
General inspection
Function inspection
It is suggested to inspect the instrument by
following steps when getting a new UTD2000/3000
series digital storage oscillograph.
1. To check if there is damage due to transportation
or not.
Please replace carton or foaming plastic protection
cushion with severe damage instantly.
2. Please inspect fitting details and shown it in
“Fittings of UTD2000/3000 series digital Storage
Oscillograph” shown in the manual. You can check
if there are deficient fittings or not by referring to it.
Please contact UNI-T distributor or local agent if
there are deficient or damaged fittings.
3. Please inspect the entire machine and contact UNI-T
distributor or local agent for damaged appearance,
abnormal operation or failing to pass performance test.
Please pay attention to packages and report to
transportation department and UNI-T distributor if
machine damage is caused by transportation.
1. Connect the power supply
You can supply power to the machine and voltage is AC
100V to AC 240V. Frequency is 45Hz to 440Hz. It has
to press [UTILITY] menu and [F1] for self-correction
after power supply 30 minutes after operation of hot
machine so that digital storage oscillograph operates
under the best status. As shown in Figure 1
4, please
enter into next page and press [F1] to call out ex-factory
setup.
㧙
UNI-T will arrange maintenance or replacement.
Please carry out once fast function inspection to
check if the machine operates normally or not.
Please operate according to following steps: