IV
ULVAC CRYOGENICS INCORPORATED
Operation ···················································································· 25
Checks prior to operation ·························································· 25
Operation preparation······························································· 25
Shutdown ·············································································· 26
Corrective action in the event of an error ······································ 27
Emergency off ········································································ 28
Manual Dispense of Liquid Nitrogen ·················································· 29
Connecting liquid nitrogen supply port ········································· 29
Dispense liquid nitrogen ···························································· 29
Disconnecting Manual Dispense Flexible Hoses ···························· 30
Automatic Supply of Liquid Nitrogen ················································· 31
Inspections before automatic transfer ·········································· 31
Automatic transfer ··································································· 31
Time limit of automatic transfer ··················································· 31
Maintenance and Inspection ···························································· 32
Daily inspection ······································································· 32
Maintenance/inspection intervals ················································ 32
Troubleshooting ············································································ 34
Accessories ················································································· 38
Warranty ····················································································· 39