ULVAC CRYOGENICS INCORPORATED
R-1
Revision History
Date
Revision No.
Contents
2001-02-26
2007-03-20
2007-08-08
2011-02-14
2011-05-16
2011-12-01
2013-03-26
2014-04-03
2016-11-21
2019-11-15
2001.02
2007MH01
2007AT02
2011FY03
2011MY04
2011DR05
2013MH06
2014AL07
2016NR08
2019NR09
First edition
Correction of the type of cold head cable connector.
Deletion of the descriptions related to adsorber replacement.
Cover: Export control policy has been revised.
Full-fledged revision.
P.B-3
~
6 C10T Compressor unit circuit diagram and wiring
diagram have been revised.
Service Network has been revised.
“Safety Instruction” No.3 and No.5 have been revised.
“SERVICE NETWORK” has been revised.
“Introduction” and “SERVICE NETWORK” have been
revised.
“Safety Instructions” and “Maintenance” have been revised.
Appendix B Figure B-1 Circuit Diagram has been modified.
SERVICE NETWORK has been revised.
Summary of Contents for C10T
Page 2: ......
Page 8: ...F 6 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank ...
Page 14: ...S 4 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank ...
Page 16: ...IW 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank ...
Page 32: ...Operation 4 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank ...
Page 44: ...Troubleshooting A 4 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank ...
Page 47: ...Compressor Unit Instruction Manual ULVAC CRYOGENICS INCORPORATED B 3 B 4 ...
Page 48: ...Compressor Unit Instruction Manual ULVAC CRYOGENICS INCORPORATED B 5 B 6 ...
Page 50: ...Flexible Hose C 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank ...
Page 54: ...CS 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank ...
Page 56: ...This page intentionally left blank R 2 ULVAC CRYOGENICS INCORPORATED ...