background image

A. GENERAL 

This gas fryer is equipped with a shortening filter system which is to be operated and cleaned according to the FRYER 
OPERATION and CLEANING sections of this manual. 
1. SHORTENING 

Use a high quality shortening to achieve a consistent quality product as well as a long term savings. 

2. SHORTENING TEMPERATURE 

Most products should be cooked with a shortening temperature about 350˚F (177˚C); however, each product should be 

cooked at the LOWEST temperature that produces a high quality product while obtaining maximum usage of the shorten-

ing. 

3. SALTING 

Products should not be salted over the fryer vessel as salt quickly deteriorates the shortening and flavors other products 

cooked in the same shortening. 

4. POWER FAILURES 

The fryer cannot be operated during power failures. DO NOT attempt to manually operate the fryer. 

 

5. PUMP MOTOR 

The filter pump motor is protected by a motor thermal overload switch. 

 

 
 
 
 

 
B. FILTERING SHORTENING 

Fryer‟s equipped with a stainless steel filter screen should be filtered at least twice a day. Place the recommended amount of 
filter agent in the shortening as prescribed by the chemical supplier and follow instructions for filtering shortening provided 
in the operating section of this manual. 

C. LEVELING SHORTENING (TOPPING OFF) 

After filtering, the shortening level must be checked and fresh shortening added when necessary. 

1. The shortening in the vat should reach to the middle line of the “E” in the word LEVEL of the shortening level mark on the 

rear wall of the fryer. 

2. If shortening is needed, Add a small amount to bring shortening to the proper level. 
3. Repeat the above steps until the shortening in the vat is at the proper level. 

D. BOILING OUT FRYER 

The fryer should be BOILED OUT every 7 DAYS to remove carbon buildup and other encrusted materials. Add the amount 

of boil out compound to the fryer as prescribed in the cleaning manual provided by the chemical supplier and follow instruc-
tions for boiling out a fryer in the operating section of this manual. 

E. CLOSING / SHUTDOWN INSTRUCTIONS 

1. CLOSING 

When closing at night; filter the shortening in the fryer, THOROUGHLY drain all filter lines and cover the fryer vessel. 

Turn the ON/OFF Switch on the fryer OFF and turn the Manual Gas Valve OFF. 

2. SHUTDOWN OR PROLONGED POWER FAILURE: 

a. Shutdown 

Perform the following whenever a fryer is being shutdown for an extended period of time: 
1. Drain and discard the shortening. 

2. THOROUGHLY clean the fryer vat. 

3. Turn the ON/OFF Switch to the OFF position, disconnect the 230-volt power cord and turn applicable Circuit  

Breakers OFF. 

4. Turn the Manual Gas Valve OFF. 

b. Prolonged power failure 

The gas fryer cannot be operated during power failures. DO NOT attempt to bypass safety controls and manually start 

the fryer. 

 
 

 

WARNING

: ENSURE THE WASH DOWN HOSE IS NOT CONNECTED TO FRYER PRIOR TO 

RESETTING A THERMAL OVERLOAD SWITCH. 

Page 12 

30A134

 

ABBREVIATED OPERATING INSTRUCTIONS 

CAUTION: 

THE GAS FRYER CANNOT BE OPERATED DURING POWER FAILURES. DO 

NOT ATTEMPT TO  

Summary of Contents for PAR-3-14HE CE

Page 1: ...TH HARD DOCK FILTRATION Operating Instructions 302 Spencer Lane P O Box 5369 San Antonio Texas 78201 800 525 8130 210 731 5000 Fax 210 731 5099 www ultrafryer com THIS APPLIANCE IS FOR PROFESSIONAL US...

Page 2: ...cket CAUTIONS These items will be indented from the main body of text the word CAUTION will be in bold capitalized print and the entire text will be enclosed by a border These items identify steps or...

Page 3: ...al 6 Rating Plate 6 Clearances 6 Standards 6 Air Supply Ventilation 6 RECEIVING INSTALLING Unpacking 7 Installing 7 Leveling 7 Gas Connection 8 Electrical Connection 8 INITIAL START UP Cleaning 10 Sta...

Page 4: ...rastat 23 Start Up and Cooking Computer Operation 23 FILTER TUB ASSEMBLY INSTALLATION Filter Tub Assembly 24 Filter Tub Installation 24 FILTERING POLISHING SHORTENING Filtering Shortening 25 26 Polish...

Page 5: ...18 gauge stainless steel and is equipped with an Ultrastat 23 Cooking Computer In addition the fryer is equipped with the NEWLY developed Hard Dock Filtration System that uses a stainless steel Filter...

Page 6: ...and other factors that affect the cook cycle Under STRAIGHT time mode the product is cooked at a specified temperature for the length of time programmed without adjusting for these variations Operati...

Page 7: ...ure Controller These controls are mounted on the Temperature Control access Panel and other fryer controls are located behind the access door The main drain valve and shortening return levers are loca...

Page 8: ...or and manual valve 3 Sensing circuit within the spark ignitor module to turn gas to the fryer OFF if a burner FLAME OUT occurs 4 A Drain Valve Safety Switch that will DISABLE the fryer each time the...

Page 9: ...4a 30A134...

Page 10: ...30A134 4b...

Page 11: ...30A134 4c...

Page 12: ...ryer equipment must be performed by Qualified Certified Licensed and or Authorized installation or service personnel Qualified personnel must be experienced in such work be familiar with all gas preca...

Page 13: ...1 2 psig 3 45kPa 2 The fryer must be isolated from the gas supply piping system by closing its individual manual shut off valve during any pressure testing of the gas supply piping system at pressures...

Page 14: ...32mm flexible gas hoses 4 feet long 1219mm with a quick disconnect coupling on one end are available from Ultrafryer Systems under PN 24322 3 4 19mm hose PN 24323 1 25mm hose and PN 24456 1 1 4 32mm h...

Page 15: ...not only dangerous but will often miss small leaks that a soapy solution would find 6 Flexible Couplings Connectors The gas inlet to the appliance shall have a thread conforming to EN 10226 2 2004 EN...

Page 16: ...E AREA SURROUNDING THE FRYER MUST BE KEPT FREE AND CLEAR OF ALL COMBUSTIBLES IV DO NOT GO NEAR THE AREA DIRECTLY OVER THE FLUE OUTLET WHEN THE FRYER S MAIN BURNERS ARE OPERATING V ALWAYS WEAR OIL PROO...

Page 17: ...spark will light the flame Ensure the pilot is lit then place the ULTRASTAT 23 Cooking Computer into the MELT MODE D SEQUENCE OF IGNITION When the lighting instruction steps are performed in the sequ...

Page 18: ...2 Turn the computer ON by depressing the computer On Off button then place the computer in the BOIL mode by pressing the P key scroll to boil press P key again to activate A BOIL will appear in the c...

Page 19: ...reach to the middle line of the E in the word LEVEL of the shortening level mark on the rear wall of the fryer 2 If shortening is needed Add a small amount to bring shortening to the proper level 3 Re...

Page 20: ...s are in their proper position b Check that the fryer electrical plug is connected to an electrical receptacle c Ensure the applicable Circuit Breaker is in the ON position and that the fryer ON OFF s...

Page 21: ...mperature recovery is slow and main burner flames are small and appear to be lethargic A Ensure that the MANUAL GAS VALVE is completely open B Check for an obstruction in the gas line C Check for an o...

Page 22: ...ED TO WARNING DO NOT ALLOW ANY CLEANING SOLUTION OR WATER TO SPLASH INTO A VESSEL OF HOT COOKING OIL AS IT WILL CONTAMINATE THE OIL AND MAY CAUSE THE OIL TO SPLATTER CAUSING SEVERE BURNS WARNING CRUMB...

Page 23: ...NGER LOOP on the straight side of FRAME B then HINGE it to remove FRAME B from the FILTER SCREENS d Separate the UPPER FILTER SCREEN and BAFFLE from the LOWER FILTER SCREEN e CAREFULLY clean the two f...

Page 24: ...ter Tub in front of the FILTER TUB GUIDES beneath the fryer then CAREFULLY and SLOWLY insert the Filter Tub into the fryer using the Standpipe Docking Handle until the MALE In Line Plug on the Standpi...

Page 25: ...he Electric and Manual Gas valves Ignitor Rod and Module as well as the High Limit Temperature switch are lo cated behind the Service Access door The Hard Docking Filtration system and Drain levers ar...

Page 26: ...nt times in a cook cycle In addition the operator can program the ULTRASTAT 23 computer to cook products under FLEX or STRAIGHT timing modes When programmed for FLEX time mode the computer will adjust...

Page 27: ...ammed 9 ENTER EXIT FILTER KEY This key will force a filter the fryer into the filter mode This key is an optional feature 10 TEMP TOGGLE CLEAR KEY a In operating mode displays the actual temperature f...

Page 28: ...D DISPLAY DESCRIPTIONS 30A134 Page 21...

Page 29: ...ON by depressing the computer ON OFF button A The MELT lamp will LIGHT to indicate the computer is in the SHORTENING MELT MODE B The HEAT lamp on the computer and the RED heat mechanism indi cator lam...

Page 30: ...emperature HEATING will appear in the display to indicate the shortening temperature is MORE than 20 F 6 6 C BELOW the setpoint temperature When shortening temperature rises to the SETPOINT tem peratu...

Page 31: ...LE DOCKING PLUG over the leading edge of the pan 4 Position the FILTER TUB COVER on the open end of the Filter Tub with the SLOT on the cover seated around the Standpipe Docking Handle Assembly Then S...

Page 32: ...ock wise to automatically return shortening in the filter tub through the SWEEP NOZZLE in the bottom of the vat When all shortening has been returned to the vat turn the LEFT HAND Vat Shortening Retur...

Page 33: ...tening RE TURN LEVER 1 4 COUNTER CLOCKWISE to automatically return shortening in the filter tub to the fryer vat 3 When all shortening in the filter tub has been returned to the fryer TURN the VAT SHO...

Page 34: ...burner tubes and all walls of the vat until all the sediment and residue at the bottom of the fryer has been flushed through the drain into the filter tub Then turn the Topside Shortening Return Lever...

Page 35: ...nse the fryer with hot water until the water coming out of the drain valve is clear 10 Mix a solution of ONE PART vinegar to 25 PARTS of water Place this mixture into a one gallon garden pressure spra...

Page 36: ...eld World Trade U S Office 3355 Enterprise Ave Suite 160 Ft Lauderdale FL 33331 Website www Greenfieldworld com 2 DAMAGES Ultrafryer Systems is not responsible for damage occurring in transit All deli...

Page 37: ...tc then obtain the part number and description for that index number on the page facing the sketches Use that part number when ordering a replacement part ULTRAFRYER MODEL PAR 3 HE CE GAS FRYER FRONT...

Page 38: ...ark Ignitor Rod Assembly Set Rod Gap to 5 32 4mm prior to installation 12C196 15 Pilot light Heat Channel 19C271 16 Docking Release Handle 19A948 17 14 Model PAR 3 H CE F F Basket Hanger Bracket 19A94...

Page 39: ...H CE 53 4 x 8 High 146 x 208mm Rectangular Flue Tube with deflector 19A910 9 Medium Duty 3 76mm Rear Caster w out Brake 28A011 10 Electrical Box Assy 12C195 11 240 Volt 75 Watt Silicon Heater 5 1524m...

Page 40: ...craper 12567 2 Micromesh S S Filter Screen Assembly with StandPipe Docking Assembly 12B113 3 Magepad Magnesol Impregnated Filter Pad with Standpipe and Docking Assembly 12B178 4 Wash Down Hose Assembl...

Page 41: ...Iron Close Nipple 24003 6 3 8 10mm x 7 177 8mm Black Iron Nipple 24470 7 1 2 13mm S S Locking Seal Inline Plug 24A208 8 1 2 13mm Handle Assy With 90 Black Iron Elbow 19A598 9 Top Compression Cap Knurl...

Page 42: ...30A134 PAR 3 H CE GAS FRYER W U23 COOKING COMPUTER Page 35 WIRING DIAGRAM...

Page 43: ...THIS PAGE INTENTIONALLY BLANK Page 36 30A134...

Reviews: