![Twisted Hobbys Crack Turbo Beaver Manual Download Page 8](http://html1.mh-extra.com/html/twisted-hobbys/crack-turbo-beaver/crack-turbo-beaver_manual_1184645008.webp)
Rev: 2013.09.15.v004a
8
THE BUILD
THE BUILD
THE BUILD
THE BUILD
CONSTRUCTION METHODS:
Building surface should be at least 2ft x 4ft and flat. Weights or some small heavy objects will be handy for holding things in place during
the time glue is setting.
Welders glue is the primary adhesive used for this build. The Rod Guides and End Links use thin CA with Applicator and Activator.
When
using the Welders glue for a butt joint, apply a thin film to each surface, allow to sit for approx five minutes and then assemble.
Note that this method will create a nearly instant bond, so locate carefully when bringing the two pieces together.
If alignment is
necessary
or a slip joint, do not allow the glue to tack up, simple apply and join immediately, you will have several minutes to locate the
two parts before the glue sets up. In most cases the parts being glued can be handled with care in 30 minutes, full cure is approx 24
hours.
Do the same with the Power Set, confirm that you have all your
items and that they appear to be in sound condition. Testing of
functionality will be one of the first steps that will follow shortly.
Open up you kit and inspect for damage and / or missing parts.
Use the Parts List on page 5 to verify that your kit is complete.