MAN205-0195042EN Rev. A
Aug. 2011
Page 47 of 137 pages
In/Out Test
– Design:
The system contains a stage called In/Out Test Stage. This includes all the required
elements for the In/Out Test.
The test includes:
Testing all the outputs. Each output is turned ON one at a time. The
output passes to ‗ON‘ for a maximum time of 15 seconds or until the
UP key is pressed.
The command begins from output number 1 until 24.
Testing of all the digital inputs should take a maximum time of 15
seconds for each input.
When the input is found in ―0‖ it will show ‗ON‘
on the screen. When the input is in ―1‖, it will show ‗OFF‘ on the screen.
All the analog inputs will be displayed on the screen without a filter. As
such, it will be able to calibrate them at the time that the display is on
the screen via the PC.
At the end of the stage, it will allow the In/Out Test to start afresh or to
exit. When exit is chosen, the system will initialize.
Inputs for the In/Out Test require a code.
Summary of Contents for 6671130
Page 2: ...Web site http www tuttnauer com...
Page 30: ...MAN205 0195042EN Rev A Aug 2011 Page 24 of 137 pages PIPING SYSTEM DRAWING...
Page 32: ...MAN205 0195042EN Rev A Aug 2011 Page 26 of 137 pages PNEUMATIC CONTROL SYSTEM DRAWING...
Page 84: ...MAN205 0195042EN Rev A Aug 2011 Page 78 of 137 pages This page intentionally left blank...
Page 128: ...MAN205 0195042EN Rev A Aug 2011 Page 122 of 137 pages This page intentionally left blank...
Page 129: ...MAN205 0195042EN Rev A Aug 2011 Page 123 of 137 pages XPCS MANUAL...