11
BRT-1 “The Brute” Plate Loaded Home Gym
FIG. 36
Locate a Nylon Pulley 3 1/2 (#65), and insert it into the hidden
pulley bracket located on the
Base Frame (#1)
, as illustrated above.
FIG. 39
Route the
Leg Extension Cable (#32)
to the
Leg Extension
Arm (#18)
following the path illustrated with the arrows.
Note:
Refer to the Cable Mapping Diagram on page 20 for further
detailed illustration of the
Leg Extension Cable (#32)
routing.
NOTE:
FIG. 38
Next, insert a Nylon Pulley 3 1/2 Rd. (#65-Labeled I) into the
pulley bracket located in front of the
Base Frame (#1)
and secure it into
place using one Hex Head Cap Screw 3/8-16 X 2 1/2 (#79), two Flat
Washers SAE 3/8” (#84), and one Nylon Insert Jam Lock Nut 3/8-16
(#85). Be sure the cable is routed properly into the pulleys groove follow-
ing the path as illustrated with the arrows .
Note:
Refer to
Fig D
on page 20 for further clarification of this as-
sembly.
NOTE:
FIG. 37
Secure the Nylon Pulley 3 1/2 Rd. (#65-Labeled H) into place
using one Hex Head Cap Screw 3/8-16 X 2 1/2 (#79), two Flat Washers
SAE 3/8” (#84), and one Nylon Insert Jam Lock Nut 3/8-16 (#85). Be sure
the cable is routed properly into the pulleys groove following the path as il-
lustrated with the arrows .
Note:
Refer to
Fig D
on page 20 for further clarification of this as-
sembly.
NOTE: