47
TOTEM 2
La traçabilité de cette vérification est formalisée par une feuille disposée sur la trappe d’accès.
Une vérification trimestrielle
La portée de cette vérification dans le cas de la tour mobile accès et de travail étant comparable à la vérification journalière, on
formalise sur le registre de sécurité de l’établissement la vérification réalisée a minima une fois tous les 3 mois.
Nota bene
: Ces vérifications ne peuvent être conduites que par du personnel titulaire d’une attestation de compétence délivrée
par le chef d’établissement portant la mention « Vérificateur et Utilisateur ».
Pour plus de renseignement et de détails au niveau des grilles de vérification, voir la RECO R.457, annexe 3, 3bis, 4, 5, 6.
After use at each site, ensure that the mobile tower is cleaned with a clean cloth.
Inspect parts before each assembly, particularly:
- Castor wheels tyres and brakes.
- Safety devices.
- Working platform hooks and fasteners.
- The plywood on the working platforms.
- The stabiliser mounting brackets.
All parts with the following defects:
- Permanent deformation.
- Perforations.
- Score marks (as a result of grinding, for example...)
- Severe oxidation
... should be discarded!
If in doubt, change the part.
When the part is being changed, it must be replaced with a genuine part.
Keep parts clean, and safety devices in good working order.
Replace or clean all the panels or stickers with operating and safety instructions.
Checks:
This product should be checked periodically and the results of these checks should be recorded (see the manufacturer check
sheet FV-26403-6xx/7xx/8xx for BOX and FV-22403-6xx/7xx/8xx for LINE).
Regulatory checks (provided for in the French decree of 21
st
December 2004) are outlined as follows:
A check prior to use at each installation site:
- when the mobile tower is used for the first time,
- when the mobile access and working tower is dismantled and then re-assembled.
- following changes in usage conditions, or atmospheric or environmental conditions which may affect the safe use of the mobile
access and working tower,
- when the tower has not been used for at least a month.
This check should include a suitability assessment, an assembly and installation assessment, as well as an assessment of its
condition. This check will be recorded in the establishment’s safety records for traceability.
A daily check