![Tubeline TL60ECV Operator'S Manual Download Page 54](http://html1.mh-extra.com/html/tubeline/tl60ecv/tl60ecv_operators-manual_1179180054.webp)
TL60ECV
-
Section 19: Option - Twin Wrap Kit 19-1
Section 19: Option - Twin Wrap Kit
Twin Wrap Kit Installation
Refer to
Parts Manual
to ensure all parts have been
received.
1. Rotate hoop to a position where the twin wrap kit
can be easily placed in position.
DANGER:
Shutoff machine before installation.
2. Open left safety guard.
3.
Place twin wrap kit on top of standard plastic film
carrier.
4. Bolt in place with provided hardware. Handles must
be placed through top side and fully tightened.
5. The 3 socket head bolts must be placed through
bottom side. Do not fully tighten to allow tensioner
to slide. See
Fig.1
.
6. Repeat steps 1-5 for other plastic wrap carrier.
Twin Wrap Kit Adjustments
1. Lift and turn handles to loosen twin wrap.
2.
Slide twin wrap left or right to increase or decrease the plastic film layer overlap.
3. Turn handles to tighten twin wrap and push them down to lock in place.
Fig .1
Fig .1
1
2
3
Summary of Contents for TL60ECV
Page 7: ...Intentionally Left Blank...
Page 12: ...TL60ECV Section 2 Safety 2 3 Clearance Markers Part No DEAMBER Part No DERED...
Page 13: ...2 4 Section 2 Safety TL60ECV Safety Decal Locations NOTE Decals shown are not to scale...
Page 39: ...11 1 Section 11 Diagnostics TL60ECV Section 11 Diagnostics Manifold Solenoid Functions...
Page 59: ...VII Imperial Torque Value Chart TL60ECV Imperial Torque Value Chart...
Page 60: ...TL60ECV Metric Torque Value Chart VIII Metric Torque Value Chart...