![Tubeline TL60ECV Operator'S Manual Download Page 43](http://html1.mh-extra.com/html/tubeline/tl60ecv/tl60ecv_operators-manual_1179180043.webp)
12-3
Section 12: Option - Power Drive -
TL60ECV
1. Chock rear tires and disengage parking brake if it is set.
2. Remove existing brake pad from parking brake bracket. Reuse bolts to fasten supplied hydraulic
motor as shown in
Fig.2.
3. Bolt right side power drive backet to right side of rear axle with supplied bolts and nuts. See
Parts
Manual
for full assembly breakdown.
NOTE:
Right rear tire may need to removed.
4. Ensure power drive gear sprockets mesh with rim gears by engaging/ disengaging handles.
5. Route hoses from main manifold valve ports
DR
and
DF
through hoop wheel mount and side
frame tube to middle of roller bed, then through the left roller bed mount plate to the hydraulic
motor. Make sure 90° hose ends are towards main manifold valve. See arrows in
Fig.2
.
6. Connect hoses as follows:
Power Drive Installation - Dual
Fig.2.
Summary of Contents for TL60ECV
Page 7: ...Intentionally Left Blank...
Page 12: ...TL60ECV Section 2 Safety 2 3 Clearance Markers Part No DEAMBER Part No DERED...
Page 13: ...2 4 Section 2 Safety TL60ECV Safety Decal Locations NOTE Decals shown are not to scale...
Page 39: ...11 1 Section 11 Diagnostics TL60ECV Section 11 Diagnostics Manifold Solenoid Functions...
Page 59: ...VII Imperial Torque Value Chart TL60ECV Imperial Torque Value Chart...
Page 60: ...TL60ECV Metric Torque Value Chart VIII Metric Torque Value Chart...