Veefil-RT 175-S Site Installation Manual
TRI125.INS.018 version 1
4 March 2020
Manual
Page 25 of 25
5.2.2
AC link test
Use a DMM and a long piece of wire to perform a continuity test between each of the
items in the following table:
Power Unit
(Isolation Switch)
Upstream Supply
Pass Criteria
Earth
L1
NC
L2
NC
L3
NC
Earth
Connected
L1
L1
Connected
L2
NC
L3
NC
Earth
NC
L2
L1
NC
L2
Connected
L3
NC
Earth
NC
L3
L1
NC
L2
NC
L3
Connected
Earth
NC
5.2.3
Waste management, tidy up and report
Finalise any waste pick up, cleaning operations, and tidy up the site.
Send the full report to Tritium and all other parties involved via
TRI125.CHK.008 Veefil-
RT 175-S System Installation Checklist
and the pictures to support the signed checklist.
6
Revision record
Revision
Date
Change
1
4 March 2020
Document creation (J Pierce, S Taylor)