Veefil-RT 175-S Site Installation Manual
TRI125.INS.018 version 1
4 March 2020
Manual
Page 24 of 25
5
Site installation handover
Complete
TRI125.CHK.008 Veefil-RT 175-S System Installation Checklist
and attach photos
of the installation.
5.1
Pre-checks
Check strain relief on power cables.
Check earths are attached on removable panels and doors.
Check if there is any remaining liquid or dust and clean the site.
5.2
Polarity, cross-wire and bolted short test
5.2.1
DC link test
Use a DMM and a long piece of wire to perform a continuity test between each of the
items in the following table:
User Unit
Power Unit
Pass Criteria
Earth
DC +
NC
DC -
NC
Earth
Connected
DC +
DC +
Connected
DC -
NC
Earth
NC
DC -
DC +
NC
DC -
Connected
Earth
NC