Remove the timber base plate.
Use the crane to lift the User Unit in place over the foundation.
Feed the cables through the hole in the foundation plate.
Align the rods from the foundation through the mounting holes in the base, and then
lower into place.
Ensure that the plastic grommets are inserted into the foundation plate.
Apply anti-seize compound to the mounting rods.
Use M16 nuts and flat washers to fasten the User Unit to the foundation, then torque to
40Nm (or 30Nm for M12).
Stow cables beneath the User Unit for protection until ready for cable termination (see
Figure 17: Mounted User Unit, and User Unit Cable Storage (Images indicative only)
4.7.3
Terminate Earthing electrode
Important
•
For EMC compliance, it is important that a local earthing electrode is used to bond the chassis of the user
unit directly to ground. This may be in the form of an earth stake, or if available, can be bonded to pre-existing
buried earth structures.
•
Prior to installation of the unit, a professional review of local lightning protection requirements must be
performed to ensure that laws and regulations are adhered to. As a result, it may be necessary to install
additional earthing electrodes for outdoor installations.
Terminate the local earth electrode to the body of the user unit on the same stud as the
protective Earth cable (Figure 18: User Unit Earth Stud Location).