Veefil-RT 175-S Site Installation Manual
TRI125.INS.018 version 1
4 March 2020
Manual
Page 16 of 25
4.6.5
Terminate the IPU AC link
Identify the AC input cables.
Note:
These are contained within conduit A as shown in
TRI125.INS.016 Veefil-RT
175-S Piping and CablingError! Reference source not found.
.
Measure, cut, and crimp with M10 cable lugs to mounting points L1, L2, L3 on load
break switch Q0, located on the bottom-left of the main gear tray
.
Figure 10: IPU 3phase AC Input isolation switch (Q0)
Measure, cut, and crimp the protective Earth with an M10 cable lug to mounting point
GNDAC1 on the bottom of the gear tray.
Figure 11: IPU Earth Terminals, Earthing Electrode Connection Point
L1 L2 L3