www.energyabsorption.com
Revision B June 2013
www.highwayguardrail.com
29
All rights in copyright reserved
Description
Interval
8. Hydraulic Pump – Clean the outside of the Hydraulic Pump as required. Check
fluid level and electrical connections. Remove all residue or debris on or around
the pump.
1 month
9. Hydraulic Rams – Clean the Hydraulic Rams. Remove all residue or debris on
or around the rams.
1 month
10. Hydraulic Hoses – Check all Hydraulic Hoses for damage, leaks or cracks.
Replace damaged or leaking hoses.
Each use
11. Clean System - Clean the system frame, Cartridges and Impact Face from dirt
and salt. Always check lubrication after cleaning.
1 month
& each
use when
salt & / or
snow are
present