www.energyabsorption.com
Revision B June 2013
www.highwayguardrail.com
19
All rights in copyright reserved
10) Assemble the Bottom Release Cable across the Arm Assemblies
Verify that the Support Frame is fully extended. Assemble the Bottom Release Cable across
Arm Assemblies
(See Figure 16).
Torque the nuts to 34±3 N-m (25±2 ft-Ib/300±24 in-lb)
making sure that roughly an equal amount of threads protrude from nuts on both ends of cable.
Lock cable in place using remaining fasteners as "jam" nuts.
Figure 16
TORQUE TO 34 N-m (-0, +3) [25 ft - Ib (-0, +2)]
TORQUE TO 34 N-m (-0, +3) [25 ft - Ib (-0, +2)]
RELEASE CABLE