Mark System Location
Locate the centerline of the system by measuring the proper offset from the fixed object.
Refer to the
Drawing Package supplied
with the system. Place chalk line to mark the
centerline of the system. Mark a construction line parallel to the center line and offset 6.5”
[165 mm] to one side as shown in Figure 15. The edge of the Monorail will
be positioned on
this line
.
Note:
The
concrete foundation
must comply with the Manufacturer’s Drawing Package supplied
with the system.
Warning:
Location of system with respect to the roadside obstacle is critical and
dependent on the type of Transition Panel used. Please refer to the
Drawing
Package supplied
with the system for details.
Figure 15
(Top view of concrete foundation)
CENTERLINE OF SYSTEM
CONSTRUCTION LINE
6.5” [165 mm]
Summary of Contents for QuadGuard M Wide
Page 1: ......
Page 44: ...TrinityHighway com 43 Revision D March 2021 Concrete Pad 618686...
Page 45: ...TrinityHighway com 44 Revision D March 2021 TS Concrete Pad 8 w Rebar 618686...
Page 46: ...TrinityHighway com 45 Revision D March 2021 TS Concrete Pad 8 wo Rebar 618686...
Page 47: ...TrinityHighway com 46 Revision D March 2021 Tension Strut Backup 627528...
Page 48: ...TrinityHighway com 47 Revision D March 2021 Monorail Assembly 625637...
Page 49: ...TrinityHighway com 48 Revision D March 2021 Diaphragm Assembly 627534...
Page 50: ...TrinityHighway com 49 Revision D March 2021...
Page 51: ...TrinityHighway com 50 Revision D March 2021...
Page 52: ...TrinityHighway com 51 Revision D March 2021 Shim Kit 627518...
Page 53: ...TrinityHighway com 52 Revision D March 2021 Fender Panel Assembly 608241...
Page 54: ...TrinityHighway com 53 Revision D March 2021 Nose Assembly 627522...
Page 55: ...TrinityHighway com 54 Revision D March 2021 End Shoe Transition 627729...
Page 56: ...TrinityHighway com 55 Revision D March 2021 31 W Beam Guardrail Transition QFMTSCVR TWLR...
Page 57: ...TrinityHighway com 56 Revision D March 2021 Thrie Beam Transition QFMTSCVR TTLR...
Page 58: ...TrinityHighway com 57 Revision D March 2021 Safety Shape Barrier Transition QFMTSCVR T4LRF...
Page 59: ...TrinityHighway com 58 Revision D March 2021 Single Slope Transition QFMTSCVR T6LRF...
Page 60: ...TrinityHighway com 59 Revision D March 2021 QuadGuard M Wide TS w Block QFMTSCVR UVB...
Page 61: ...TrinityHighway com 60 Revision D March 2021 Vertical Barrier Transition QFMTSCVR ESLR...
Page 62: ...TrinityHighway com 61 Revision D March 2021 TS Concrete Pad w Block 627903...
Page 63: ...TrinityHighway com 62 Revision D March 2021...
Page 64: ......