21
Revision D March 2021
How to Determine Left/Right
To determine left from right when ordering parts, stand in front of the system facing the roadside
obstacle. Your left is the system’s left and your right is the system’s right.
Counting the Number of Bays
One Bay consists of one Cartridge, one Diaphragm, and two Fender Panels. The Nose section is
not considered a Bay, though there is a Cartridge in the Nose of each system.
Note:
There will always be one more Cartridge in the system than the number of Bays in the
system. To determine number of Bays, count Fender Panels on one side (Figure 13).
Measuring the Width
The nominal width of a
Wide (flared)
system is the width at the location shown (Figure 14).
The outside width of the system is approximately 6” [152 mm] wider than the nominal width.
Note:
The outside width of the system is not the same as the width of the Backup.
Figure 13
System Orientation
Figure 14
Width of Flared System
RIGHT
FENDER PANELS
DIAPHRAGM
CARTRIDGE
LEFT
FRONT
BAY
BAY
BAY
BAY
BAY
BAY
NOSE
REAR
Summary of Contents for QuadGuard M Wide
Page 1: ......
Page 44: ...TrinityHighway com 43 Revision D March 2021 Concrete Pad 618686...
Page 45: ...TrinityHighway com 44 Revision D March 2021 TS Concrete Pad 8 w Rebar 618686...
Page 46: ...TrinityHighway com 45 Revision D March 2021 TS Concrete Pad 8 wo Rebar 618686...
Page 47: ...TrinityHighway com 46 Revision D March 2021 Tension Strut Backup 627528...
Page 48: ...TrinityHighway com 47 Revision D March 2021 Monorail Assembly 625637...
Page 49: ...TrinityHighway com 48 Revision D March 2021 Diaphragm Assembly 627534...
Page 50: ...TrinityHighway com 49 Revision D March 2021...
Page 51: ...TrinityHighway com 50 Revision D March 2021...
Page 52: ...TrinityHighway com 51 Revision D March 2021 Shim Kit 627518...
Page 53: ...TrinityHighway com 52 Revision D March 2021 Fender Panel Assembly 608241...
Page 54: ...TrinityHighway com 53 Revision D March 2021 Nose Assembly 627522...
Page 55: ...TrinityHighway com 54 Revision D March 2021 End Shoe Transition 627729...
Page 56: ...TrinityHighway com 55 Revision D March 2021 31 W Beam Guardrail Transition QFMTSCVR TWLR...
Page 57: ...TrinityHighway com 56 Revision D March 2021 Thrie Beam Transition QFMTSCVR TTLR...
Page 58: ...TrinityHighway com 57 Revision D March 2021 Safety Shape Barrier Transition QFMTSCVR T4LRF...
Page 59: ...TrinityHighway com 58 Revision D March 2021 Single Slope Transition QFMTSCVR T6LRF...
Page 60: ...TrinityHighway com 59 Revision D March 2021 QuadGuard M Wide TS w Block QFMTSCVR UVB...
Page 61: ...TrinityHighway com 60 Revision D March 2021 Vertical Barrier Transition QFMTSCVR ESLR...
Page 62: ...TrinityHighway com 61 Revision D March 2021 TS Concrete Pad w Block 627903...
Page 63: ...TrinityHighway com 62 Revision D March 2021...
Page 64: ......