Post-Impact Instructions
Important:
Trinity Highway makes no recommendation whether use or
reuse of any part of the system is appropriate or acceptable following an
impact. It is the sole responsibility of the local highway authority and its
engineers to make that determination. It is critical that you inspect this
product after assembly is complete to make certain that the instructions
provided in this manual have been strictly followed.
1) Deploy appropriate traffic-control devices.
2) Ensure all anchor bolts have remained firmly anchored in the roadway surface. Replace
any loose, broken, or pulled out anchors.
The performance of the system during an angle impact depends on a properly
anchored Monorail.
3) Clear and dispose of any debris on site.
4) Ensure the Mushroom Washer Assemblies are intact so the system can be restored to its
original position.
Caution:
Use eye protection and gloves when refurbishing the Mushroom
Washer Die Spring Assembly. Do not place fingers underneath an assembled
Mushroom Washer. Parts may suddenly shift and fingers may be pinched. If the
Die Spring is still under compression as the nut is nearing the end of the bolt, to
prevent injury make sure that the Die Spring is restrained with a clamp so it does
not suddenly release when the nut is removed from the Mushroom Washer Bolt.
5) The Diaphragm Support Legs are all properly attached to the Monorail.
6) Remove the Nose Assembly and attach a chain to the Pullout Brackets on the first
Diaphragm (Figure 36). Attach both ends of chain to a heavy vehicle (such as a 1 ton
pickup).
Warning:
Stand clear in case chain breaks or becomes disconnected.
Figure 36
Pullout Brackets
Important:
Slowly pull the system forward to its original length. Have someone
watch the repositioning to ensure undetected damage does not cause the
Diaphragms to bind or pull out improperly.
Summary of Contents for QuadGuard M Wide
Page 1: ......
Page 44: ...TrinityHighway com 43 Revision D March 2021 Concrete Pad 618686...
Page 45: ...TrinityHighway com 44 Revision D March 2021 TS Concrete Pad 8 w Rebar 618686...
Page 46: ...TrinityHighway com 45 Revision D March 2021 TS Concrete Pad 8 wo Rebar 618686...
Page 47: ...TrinityHighway com 46 Revision D March 2021 Tension Strut Backup 627528...
Page 48: ...TrinityHighway com 47 Revision D March 2021 Monorail Assembly 625637...
Page 49: ...TrinityHighway com 48 Revision D March 2021 Diaphragm Assembly 627534...
Page 50: ...TrinityHighway com 49 Revision D March 2021...
Page 51: ...TrinityHighway com 50 Revision D March 2021...
Page 52: ...TrinityHighway com 51 Revision D March 2021 Shim Kit 627518...
Page 53: ...TrinityHighway com 52 Revision D March 2021 Fender Panel Assembly 608241...
Page 54: ...TrinityHighway com 53 Revision D March 2021 Nose Assembly 627522...
Page 55: ...TrinityHighway com 54 Revision D March 2021 End Shoe Transition 627729...
Page 56: ...TrinityHighway com 55 Revision D March 2021 31 W Beam Guardrail Transition QFMTSCVR TWLR...
Page 57: ...TrinityHighway com 56 Revision D March 2021 Thrie Beam Transition QFMTSCVR TTLR...
Page 58: ...TrinityHighway com 57 Revision D March 2021 Safety Shape Barrier Transition QFMTSCVR T4LRF...
Page 59: ...TrinityHighway com 58 Revision D March 2021 Single Slope Transition QFMTSCVR T6LRF...
Page 60: ...TrinityHighway com 59 Revision D March 2021 QuadGuard M Wide TS w Block QFMTSCVR UVB...
Page 61: ...TrinityHighway com 60 Revision D March 2021 Vertical Barrier Transition QFMTSCVR ESLR...
Page 62: ...TrinityHighway com 61 Revision D March 2021 TS Concrete Pad w Block 627903...
Page 63: ...TrinityHighway com 62 Revision D March 2021...
Page 64: ......