![Traub TNL20 Operating Instructions Manual Download Page 55](http://html1.mh-extra.com/html/traub/tnl20/tnl20_operating-instructions-manual_1153101055.webp)
55
Transport and installation
TNL20
DTE022DE - 24.06.2021
Installation of the machine
Mechanical preparation for central and decentralized extraction system with a
shutoff damper / with a fire extinguishing system
Connecting the machine to central extraction system
Shutoff damper for fire protection
Operating the machine with cutting oil
When operated with cutting oil, the machine is fitted as standard
with a shutoff damper for fire protection.
Operating the machine with emulsion
If the operator does not have a shutoff damper for fire protection
in the central exhaust system, it must be installed by the machine
manufacturer's service personnel when the machine is installed.
Mechanical preparation for central and decentralized extraction system without a
shutoff damper / without a fire extinguishing system
Summary of Contents for TNL20
Page 6: ...Table of Contents 6 Transport and installation TNL20 DTE022EN 02 08 2022...
Page 10: ...10 Transport and installation TNL20 DTE022EN 14 03 2022 Safety...
Page 20: ...20 Transport and installation TNL20 DTE022EN 14 03 2022 General...
Page 66: ...66 Transport and installation TNL20 DTE022EN 14 03 2022 Electrical connection...
Page 68: ...68 Transport and installation TNL20 DTE022DE 24 06 2021 Operating material...
Page 70: ...70 Transport and installation TNL20 DTE022DE 24 06 2021 Pneumatic connection...
Page 72: ...72 Transport and installation TNL20 DTE022DE 24 06 2021 Switching on the machine...
Page 73: ......