![Traub TNL20 Operating Instructions Manual Download Page 52](http://html1.mh-extra.com/html/traub/tnl20/tnl20_operating-instructions-manual_1153101052.webp)
52
Transport and installation
TNL20
DTE022DE - 24.06.2021
Installation of the machine
• Tighten the adjusting screw
D
.
• Secure the adjusting screws with the hexagonal nuts
• Screw the two connection brackets to the machine base positions provided
for this purpose; the connection brackets must be adjusted at the bottom.
M16x45 screws and washers (2x each)
Tightening torque max. 80 Nm
• Use an 18 mm dia. masonry drill to drill a 125 mm deep hole in the founda-
tion through the holes in each of the two connection brackets.
• Insert a mortar cartridge and threaded bar (M16x250) (included in machine
accessories). The length of the threaded bar may need to be adjusted.
Follow the documentation of the manufacturer of the mortar
cartridge.
• After the mortar cartridge curing time specified by the manufacturer, secure
the machine to the threaded rods using the hex nuts and washers.
Tightening torque max. 80 Nm.
Summary of Contents for TNL20
Page 6: ...Table of Contents 6 Transport and installation TNL20 DTE022EN 02 08 2022...
Page 10: ...10 Transport and installation TNL20 DTE022EN 14 03 2022 Safety...
Page 20: ...20 Transport and installation TNL20 DTE022EN 14 03 2022 General...
Page 66: ...66 Transport and installation TNL20 DTE022EN 14 03 2022 Electrical connection...
Page 68: ...68 Transport and installation TNL20 DTE022DE 24 06 2021 Operating material...
Page 70: ...70 Transport and installation TNL20 DTE022DE 24 06 2021 Pneumatic connection...
Page 72: ...72 Transport and installation TNL20 DTE022DE 24 06 2021 Switching on the machine...
Page 73: ......