![Traub TNL20 Operating Instructions Manual Download Page 22](http://html1.mh-extra.com/html/traub/tnl20/tnl20_operating-instructions-manual_1153101022.webp)
22
Transport and installation
TNL20
DTE022DE - 02.08.2022
Preparing the machine for transport
Seal disconnected hose lines or pipelines
To prevent leakage of the remaining cutting oil or cooling lubricant from the
lines, the disconnected connection kits or pipelines must be sealed with plugs.
Example shown
Hose from lifting pump for chip conveyor
Connection kits
Corrosion protection
Before delivery, all machines are provided with corrosion protection. For every
further transport, the corresponding corrosion protection must be renewed.
Details on corrosion protection can be found in the documentation
Notes on Operating Materials
.
Summary of Contents for TNL20
Page 6: ...Table of Contents 6 Transport and installation TNL20 DTE022EN 02 08 2022...
Page 10: ...10 Transport and installation TNL20 DTE022EN 14 03 2022 Safety...
Page 20: ...20 Transport and installation TNL20 DTE022EN 14 03 2022 General...
Page 66: ...66 Transport and installation TNL20 DTE022EN 14 03 2022 Electrical connection...
Page 68: ...68 Transport and installation TNL20 DTE022DE 24 06 2021 Operating material...
Page 70: ...70 Transport and installation TNL20 DTE022DE 24 06 2021 Pneumatic connection...
Page 72: ...72 Transport and installation TNL20 DTE022DE 24 06 2021 Switching on the machine...
Page 73: ......