![Traub TNL20 Operating Instructions Manual Download Page 21](http://html1.mh-extra.com/html/traub/tnl20/tnl20_operating-instructions-manual_1153101021.webp)
21
Transport and installation
TNL20
DTE022DE - 02.08.2022
Preparing the machine for transport
Locations of the axes for attaching the transport locks
For transport, the tool carriers, main and counter spindles, the
front working attachment and the workpiece removal unit must be
moved to the specified positions so that the transport locks can be
attached.
Axis
Location
Main spindle
Sliding headstock
operation
Z1
+ 115.0
Sliding/fixed
headstock operation
Z1
+
70.0
Counter spindle
Z4
+ 281.0
X4
+ 121.0
Upper tool carrier
V1
+
93.0
X1
+ 182.0
Y1
+
20.0
H1
any station
Upper tool carrier
with B axis
V1
+
75.5
X1
+ 182.0
Y1
+
20.0
H1
any station
B1
0°
Lower tool carrier
Z2
+
93.0
X2
+ 390.0
Y2
-
20.0
H2
any station
Front working
attachment
Z3
+ 300.0
X3
+
33.7
H3
Station 3
Workpiece removal
Z5
+ 421.0
Summary of Contents for TNL20
Page 6: ...Table of Contents 6 Transport and installation TNL20 DTE022EN 02 08 2022...
Page 10: ...10 Transport and installation TNL20 DTE022EN 14 03 2022 Safety...
Page 20: ...20 Transport and installation TNL20 DTE022EN 14 03 2022 General...
Page 66: ...66 Transport and installation TNL20 DTE022EN 14 03 2022 Electrical connection...
Page 68: ...68 Transport and installation TNL20 DTE022DE 24 06 2021 Operating material...
Page 70: ...70 Transport and installation TNL20 DTE022DE 24 06 2021 Pneumatic connection...
Page 72: ...72 Transport and installation TNL20 DTE022DE 24 06 2021 Switching on the machine...
Page 73: ......