Installation
WARNING
Ground Wire!
All field-installed wiring must be completed by qualified personnel. All field-installed wiring
must comply with NEC and applicable local codes. Failure to follow this instruction could result
in death or serious injuries.
WARNING
Grounding Required!
Follow proper local and state electrical code on requirements for grounding. Failure to follow
code could result in death or serious injury.
[ ] Install proper grounding wires to an earth ground.
Field Installed Control Wiring Requirements
115 Volt Control Wiring (All Units)
WARNING
Hazardous Voltage!
Disconnect all electric power, including remote disconnects before servicing. Follow proper
lockout/tagout procedures to ensure the power can not be inadvertently energized. Failure to
disconnect power before servicing could result in death or serious injury.
[ ] Verify that the Control transformer (1T1) is wired for the proper operating voltage.
[ ] Connect properly sized wiring to the liquid line solenoid valve(s).
[ ] Connect properly sized wiring to the hot gas bypass solenoid valve(s), if applicable, to operate
with the unit. Refer to the unit wiring diagram that shipped with the unit.
[ ] Install the interlock circuitry wiring for the air handling unit or the chilled solution pump to permit
compressor operation after the fan or chilled solution pump has started, i.e., proof of fan operation
device, fan starter auxiliary contacts or pump starter station, pump starter auxiliary contacts, proof
of flow device, etc). Refer to the field connection diagram that shipped with the unit for interlocking
information.
[ ] Install properly sized power supply wiring, with over current protection, to the proper
termination point for the field provided economizer actuator(s), if applicable. Refer to the
“Economizer Actuator Circuit” illustrated in the “Field Installed Control Wiring” section.
”No Controls” Units
[ ] A field provided “step” controller must be installed and properly wired. Refer to the field
connection diagram for connection information.
“EVP” Chiller Units
WARNING
Hazardous Voltage!
Disconnect all electric power, including remote disconnects before servicing. Follow proper
lockout/tagout procedures to ensure the power can not be inadvertently energized. Failure to
disconnect power before servicing could result in death or serious injury.
[ ] Install the EVP chiller remote panel.
[ ] Install and connect properly sized control wiring to the proper termination points between the
remote panel and the unit control panel.
Summary of Contents for RAUC-C20
Page 10: ...10 SS SVX09A EN Installation Figure 3 RAUC C20 Unit Dimensional Data Recommended Clearances...
Page 11: ...SS SVX09A EN 11 Installation Figure 4 RAUC C25 Unit Dimensional Data Recommended Clearances...
Page 12: ...12 SS SVX09A EN Installation Figure 5 RAUC C30 Unit Dimensional Data Recommended Clearances...
Page 13: ...SS SVX09A EN 13 Installation Figure 6 RAUC C40 Unit Dimensional Data Recommended Clearances...
Page 14: ...14 SS SVX09A EN Installation Figure 7 RAUC C50 Unit Dimensional Data Recommended Clearances...
Page 15: ...SS SVX09A EN 15 Installation Figure 8 RAUC C60 Unit Dimensional Data Recommended Clearances...
Page 55: ...SS SVX09A EN 55 Installation Field Connection Diagram Notes for all System Control Options...
Page 67: ...SS SVX09A EN 67 Installation Figure 33 6RT1 Discharge Air Sensor Assembly...
Page 96: ...96 SS SVX09A EN System Start Up Figure 47 20 Ton Pressure Curve...
Page 97: ...SS SVX09A EN 97 System Start Up Figure 48 25 Ton Pressure Curve...
Page 98: ...98 SS SVX09A EN System Start Up Figure 49 30Ton Pressure Curve...
Page 99: ...SS SVX09A EN 99 System Start Up Figure 50 40 Ton Pressure Curve per Circuit...
Page 100: ...100 SS SVX09A EN System Start Up Figure 51 50 Ton Pressure Curve per Circuit...
Page 101: ...SS SVX09A EN 101 System Start Up Figure 52 60 Ton Pressure Curve per Circuit...