4200FA Installation and Operation Manual
25
4.3
Power Connections 50 kVA
The following illustrates the wiring connections from the power distribution panel (not
part of the UPS) to the terminal block of the 50 kVA UPS Model
The Ground lugs are located to the left of TB4. See illustration, below.
Optional: Bypass Input: 3-phase, 3-wire
Optional: Bypass Input:
3-phase, 3-wire
208 V requires 3-phase,
4-wire
(H1) (H2) (H3) (N)
(H1) (H2) (H3) (N) (L1) (L2) (L3) (N) (+) (-)
OUTPUT: 3-phase (4-wire)
INPUT: 3-phase, 3-wire
208 V requires 3-phase,
4-wire
TB1
TB4
BATTERY
Ground Lugs (2)
Wire Capacity:
#14 – 1/0 AWG
TB4
TB1
50kVA with Back
Panel Removed
Summary of Contents for 4200FA CT
Page 2: ...4200FA Installation and Operation Manual ...
Page 4: ...4200FA Installation and Operation Manual ...
Page 10: ...iv 4200FA Installation and Operation Manual This Page Intentionally Left Blank ...
Page 14: ...4 4200FA Installation and Operation Manual NOTE This Label for Battery Units Only ...
Page 85: ...4200FA Installation and Operation Manual 75 APPENDIX A Seismic Anchorages ...
Page 86: ...76 4200FA Installation and Operation Manual ...
Page 87: ...4200FA Installation and Operation Manual 77 ...
Page 88: ...78 4200FA Installation and Operation Manual ...
Page 96: ......
Page 97: ......