4200FA Installation and Operation Manual
23
4.2 Control Circuit and External Battery Interface Connections 15/25/30 kVA
The following illustrates the wiring connections of the Control Circuits, and Battery Interface
Circuits.
NOTE: Control circuit wiring should be routed in its own conduit. Do not route control circuit wiring
through conduit containing UPS power cables.
(1) Low Battery
(2) Battery Discharge
(3) Fault
(4) Not Used
(5) Inverter Supply
(6) Inverter Supply
(7) 24Vdc – 1A max. (P24A3)
(8) Remote Run (Switch UPS to Inverter Mode)*
(9) 24Vdc – 1 A max. (P24A3)
(10) Remote Stop (Switch UPS to Static Bypass)*
(11) Bypass
(12) COMMON
(13) EPO (24Vdc – 1A max.)
(14) EPO (24Vdc – 1A max.)
(15) – (24) Not Used
*Must be programmed in via the front panel
Battery Connection
(+) Positive
(-) Negative
(3) Battery Shunt Trip
(4) Battery Shunt Trip
(5) Battery Aux.
(6) Battery Aux.
(These terminals not available on Base units)
(These terminals on ALL units)
Summary of Contents for 4200FA CT
Page 2: ...4200FA Installation and Operation Manual ...
Page 4: ...4200FA Installation and Operation Manual ...
Page 10: ...iv 4200FA Installation and Operation Manual This Page Intentionally Left Blank ...
Page 14: ...4 4200FA Installation and Operation Manual NOTE This Label for Battery Units Only ...
Page 85: ...4200FA Installation and Operation Manual 75 APPENDIX A Seismic Anchorages ...
Page 86: ...76 4200FA Installation and Operation Manual ...
Page 87: ...4200FA Installation and Operation Manual 77 ...
Page 88: ...78 4200FA Installation and Operation Manual ...
Page 96: ......
Page 97: ......