10
4200FA Installation and Operation Manual
2.0
Product Unpacking / Inspection / Storage / Disposal
2.1
Unpack the Premium 15/25/30 kVA UPS (with Casters)
(EXCLUDING Seismic and Base versions – See 2.2)
Carefully inspect the UPS for shipping damage. Units shipped within North America and NAFTA are shrink
wrapped.
3. Place the tie brackets in the slots at
the lower end of the ramps.
SLOWLY roll the unit down the
ramp.
4. Save the loading rails for seismic
anchoring of the UPS. See pg. 14.
DANGER
TOP HEAVY EQUIPMENT. IMPROPER LIFTING CAN RESULT IN INJURY OR
DEATH. LIFT AND MOVE CAREFULLY AND ONLY WITH ADEQUATE
EQUIPMENT AND TRAINED PERSONNEL. THIS EQUIPMENT WILL TIP OVER
EASILY UNTIL FIXED IN PLACE.
1. Remove shrink wrap.
2. Unbolt the rails from both the unit
and the shipping pallet.
Place the rails on the front of
the pallet.
Use the four 1/2 x 3" bolts to
secure the rails to the shipping
pallet.
Attach the rails as shown to the
front of the pallet.
Summary of Contents for 4200FA CT
Page 2: ...4200FA Installation and Operation Manual ...
Page 4: ...4200FA Installation and Operation Manual ...
Page 10: ...iv 4200FA Installation and Operation Manual This Page Intentionally Left Blank ...
Page 14: ...4 4200FA Installation and Operation Manual NOTE This Label for Battery Units Only ...
Page 85: ...4200FA Installation and Operation Manual 75 APPENDIX A Seismic Anchorages ...
Page 86: ...76 4200FA Installation and Operation Manual ...
Page 87: ...4200FA Installation and Operation Manual 77 ...
Page 88: ...78 4200FA Installation and Operation Manual ...
Page 96: ......
Page 97: ......