![Toshiba 4200FA CT Installation And Operation Manual Download Page 24](http://html.mh-extra.com/html/toshiba/4200fa-ct/4200fa-ct_installation-and-operation-manual_431535024.webp)
14
4200FA Installation and Operation Manual
2.5
Inspect UPS equipment After Unpacking:
1) Check the unit for loose, broken, bent or other damaged parts. If damage has
occurred during shipment, keep all packing materials for return to the shipping
agent. The equipment warranty will not apply to units that are damaged during
shipment.
2) Check to see that the rated capacity and the model number specified on the
nameplate conform to the order specifications.
2.6
Permanent Anchoring for Premium 15/25/30/50 kVA UPS (with Casters)
Use the shipping rails for permanent anchoring of the castor-equipped 4200FA.
Anchoring for 15-30 kVA 4200FA with Casters
30”
20”
36.3”
59.7”
24.2”
13.5”
Summary of Contents for 4200FA CT
Page 2: ...4200FA Installation and Operation Manual ...
Page 4: ...4200FA Installation and Operation Manual ...
Page 10: ...iv 4200FA Installation and Operation Manual This Page Intentionally Left Blank ...
Page 14: ...4 4200FA Installation and Operation Manual NOTE This Label for Battery Units Only ...
Page 85: ...4200FA Installation and Operation Manual 75 APPENDIX A Seismic Anchorages ...
Page 86: ...76 4200FA Installation and Operation Manual ...
Page 87: ...4200FA Installation and Operation Manual 77 ...
Page 88: ...78 4200FA Installation and Operation Manual ...
Page 96: ......
Page 97: ......