89
3-7-2
INSPECTION OF NITROGEN GAS PRESSURE
1.
Place the hydraulic breaker about 50cm
(1.64ft) from the ground in a horizontal
position for easy access.
Stop the excavator engine.
2.
Remove the gas valve plug (1) from the cylinder cover.
P.S : In regard to the side mount silenced bracket remove the bolt(4) and turn over the cover (5)
and continue the work process of 2.
3.
Insert a pressure gauge (A) into the gas
valve (2) and measure the nitrogen gas
pressure
Filling nitrogen gas pressure at usual
atmosphere temperature (
40
℃)
◆Refer to the attached graph when the breaker body temperature is lower than
40℃ (104F).
Model TNB-
08M
1M
2M
3MB
4M
5M
Nitrogen Gas Pressure(MPa)
0.75~0.8
0.75~0.8
0.75~0.8
0.75~0.8
0.75~0.8
0.75~0.8
Model TNB-
6M
6E
7J
16K
110
141LU
151LU2
Nitrogen Gas Pressure(MPa)
0.95~1.0
0.75~0.8
0.85~0.9
0.75~0.8
0.75~0.8
1.04
~1.1
Model TNB-
27K
190LU2
230LU2
310LU1
60K
400LU2
Nitrogen Gas Pressure(MPa)
0.75~0.8
0.75~0.8
0.75~0.8
0.75~0.8
When checking the nitrogen gas pressure, make sure the hydraulic breaker is cooled off.