26
2-7.
INSTALLATION OF CHISEL
2-7-1
TOP MOUNT BRACKET, SIDE MOUNT BRACKET
1.
Lay the hydraulic breaker on the ground.
Stop the excavator engine.
2.
Apply grease to the inside of the chisel
bushing (1) and the chisel (2), and insert the
chisel into the chisel holder.
3.
Insert the retainer pins (3).
4.
Assemble the retainer pin plugs (4).
Hammer in plugs after setting notch
direction.
Use a crane (A) when installing the chisel for
sizes from TNB-6E and up.
A
3
WARNING
2
1
CAUTION
If the grease is not applied correctly, it may
cause a seizure of chisel bushing, chisel
holder bushing and chisel
4
CAUTION
To avoid drop of retainer pin plug(4), make
sure to clean the retainer pin plug(4) and its
hole, and insert that plug using hammer
deep into its position so that surface of that
plug(4) get lower than breaker body.
Summary of Contents for TNB-08M
Page 133: ...TOKU Pneumatic Co Ltd...