![TLM PRIME 400 Use And Maintenance Handbook Download Page 63](http://html1.mh-extra.com/html/tlm/prime-400/prime-400_use-and-maintenance-handbook_1121247063.webp)
Use and Maintenance Handbook
– Prime 400 Packaging Machine
Page 63 of 71
Information regarding the maintenance and planned
Ordinary servicing involves mechanical interventions (adjustments, lubrication,
and cleaning) and electrical interventions to be carried out periodically on the
system consulting the charts on the following pages.
COMPLETE MAINTENANCE IS ADVISED EVERY TIME PRODUCTION HAS TO BE
SUSPENDED FOR A LONG TIME.
AS REGARDS THE MAINTENANCE OPERATIONS RELATIVE TO THE COMMERCIALLY-
SOURCED COMPONENTS IN THE MACHINE, REFER TO THE SPECIFIC TECHNICAL
DOCUMENTS.
General regulations for the maintenance of the Mechanical Components
During the dismantling of the component prevent dust residuals getting into
the work areas and the components themselves.
Do not use compressed air to clean mechanical parts. Dust must only be
removed with a vacuum device or cloths.
Do not use petrol or flammable solvents such as detergent but always use
authorised non-inflammable commercially available components that are
non toxic.
General regulations for the maintenance of the Electrical Components
Pay attention to the general regulations for the mechanical components.
Do not make holes in electrical wires or raceways when wires are in them.
Do not use water, pieces of sponge, moist cloths and/or abrasives to clean
the machine and the electrical components.