Content
1 Warnings and legal notes
UM-3
Residual risks, Iso 9001:2015, Warranty conditions
UM-4
Environmental indications, Safety warnings for handling and transport
UM-5
Packaging, Transport
UM-6
Handling and lifting, Check axis integrity after shipment, Installation
UM-7
2 CTU - basic components
What’s included
UM-8
Robot compatibility
UM-8
3 Specific system references
UM-9
4 Installation instructions
Handling CTU, Sensors
UM-11
Installing CTU
UM-12
Mounting the robot on CTU UM-13
Connecting CTU
UM-14
Connecting the robot
UM-16
Air connection, Carriage blocking element (optional)
UM-17
Notes on lubrication
UM-18
5 Rollon URCap manual (e-Serie)
Rollon URCap Installation
UM-19
Drive configuration
UM-21
IP connection
UM-22
Manual positioning of the axis
UM-23
Polyscope programming
UM-24
Errors
UM-27
Support
UM-29
6 Rollon URCap manual (CB-Serie)
Rollon URCap Installation
UM-30
Drive configuration
UM-32
IP connection
UM-33
Manual positioning of the axis
UM-34
Polyscope programming
UM-35
Errors
UM-39
Support
UM-41
Annexes
:
•
Manual of the motor
•
Manual of Rollon electrical cabinet
Summary of Contents for ROLLON CTU 220-1I
Page 2: ......
Page 44: ...UM 42 Notes Notes...
Page 45: ...UM 43 Cobot Transfer Unit Notes...
Page 46: ...UM 44 Notes Notes...
Page 47: ......