Thermo Scientific
Chapter 3
|
Operating information
HyPerforma Smartainer 3.0 User’s Guide
|
21
Figure 3.6. BPC properly placed inside the unit.
Figure 3.5. Uninflated BPC placed in the unit.
4. Align and adjust the corners of the BPC with the corners of the
unit. Ensure that the tubing is in place in the front of the port
holders located on the front of the unit, and that the resistance
temperature detector (RTD) port is located on the front left side
(Figure 3.6). The BPC must be oriented correctly so that as it
inflates, or fills, the BPC ports will be in the proper location at the
front of the unit.
5. Guide the tubing through the cutouts on the Smartainer 3.0 unit, and
latch the bottom of the port holder to secure the tubing (Figure 3.7).