Maintenance and Calibration
Performing a Flow Calibration
Thermo Fisher Scientific
PDM 3600 Instruction Manual
5-41
Figure 5–60.
Flow calibration orifices
Figure 5–61.
Black orifice installed in sample line and flow meter tubing
16.
When in the Warning/Confirmation screen with an “Attach orifice”
message, select the “OK” button. The Flow Calibration screen will
display with the Pump Speed white box active.
17.
Do Not adjust the pump speed. Enter the Orifice 1 flow rate from the
flow meter (typically 2.0 lpm).
18.
Select the “Apply” button. The PDM unit will continue the flow
calibration routine and will display a “Please wait, gathering data”
message on the Calibrate/Audit screen.
19.
A Warning/Confirmation screen will display with an “Attach yellow or
red orifice inline between flow meter and cap lamp tube” message.
20.
Remove the black orifice from the sample line and flow meter tubing.
21.
Install the yellow or red orifice into the sample line then install the
other end of the orifice into the tubing that is attached to the flow
meter (
Figure 5–62
).
Figure 5–62.
Yellow orifice installed
Summary of Contents for 3600 PDM
Page 1: ...Model 3600 PDM Personal Dust Monitor Part Number 42 009904 8Oct2013...
Page 16: ......
Page 52: ......
Page 70: ......