53
In-Cab Control Box
INSTALLATION MENU
From the Standard Display press the ENTER plus the DOWN key for 3 seconds to enter the Installation Menu: the first parameter will be displayed, the value
in the large digits and its name in the small digits. To modify the parameter value press the ENTER key, the value will flash, press the UP or DOWN key to
modify the value and confirm by pressing the ENTER key again. To scroll through the menu press the UP or DOWN keys.
NOTE: Some Direct Smart Reefer versions show the setpoint temperature (SP) as the first parameter in the Installation Menu.
NAME
DESCRIPTION
DEFAULT
MIN
MAX
diF
Set Points Differential
Once the setpoint temperature has been reached, and while the temperature remains between
diF
º
C/
º
F above or below the setpoint, there is
no demand for transfer of heat or cold, and the unit remains in null mode. Increments of 1
º.
3
1
5
SSC
Soft Start Cycles (ON/OFF)
Programmable soft start for the road compressor clutch.
OFF
OFF
ON
dit
Defrost Initiation Timer (Minutes)
Increments of 30 minutes.
On time out the unit will switch from cool to the appropriate defrost mode. The timer will count all the time the system is in any cool mode. The
timer will be reset when a defrost starts.
When the value is set at 0, is the test position: the defrost will begin in 15 seconds.
240
30
480
dtt
Defrost Termination Timer (Minutes)
Increments of 5 minutes.
Timer will count from defrost mode initiation. Timer will reset after a temperature defrost termination or timer time out. On time out the unit will
switch from defrost to null mode.
When the value is set at 0, is the test position: the defrost will stop in 15 seconds.
30
5
50
EFc
Evaporator Fans Constant Blow
on:
evaporator fans stays on also during null mode.
off:
evaporator fans cycles on and off with the regulators.
OFF
OFF
ON
dAL
Out Of Range Alarm
Progammable from 1
º
up to 10
º
or off (0). When the difference between the return air temperature and the set point exceeds the on-screen
return air temperature reading flashes.
0
0
10
HC
Hour Counter Initial Value For Maintenance Purposes
(Tens of hours, e.g. 150=1500 hours), programmable from 1000 up to 5000, 500 steps.
150
0
500
Summary of Contents for B-100-10
Page 9: ...9 Required Tools...
Page 13: ...13 Installing the Condenser Unit roof mounted ASA052 T 10 min...
Page 15: ...15 Installing the Condenser Unit roof mounted T 12 min...
Page 17: ...17 Installing the Condenser Unit front mounted T 10 min...
Page 19: ...19 Installing the Condenser Unit front mounted C T 15 min...
Page 21: ...21 Installing the ES100 Evaporator Unit T 20 min...
Page 23: ...23 Preparing Refrigeration Hoses T 10 min...
Page 25: ...25 Connecting Hoses to the Condenser Unit T 10 min...
Page 27: ...27 Connecting Hoses to the ES100 Evaporator T 14 min...
Page 29: ...29 Electrical Connections in the ES100 Evaporator T 10 min...
Page 31: ...31 Drain Circuit in the ES100 Evaporator T 5 min...
Page 33: ...33 Circuit Seal Test...
Page 35: ...35 In Case of Leaks 250 psig...
Page 37: ...37 Installing the In Cab Control 1 3 T 10 min...
Page 39: ...39 Optional Internal DIN Adaptor T 5 min...
Page 41: ...41 Control Cable Connection T 5 min...
Page 43: ...43 Battery Connection T 15 min...
Page 45: ...45 Fitting the Power Supply Units with Electric Standby T 10 min...
Page 47: ...47 Door Switch Connection DSW1 CHW T 1 min...
Page 49: ...49 Installing the Deflector T 5 min...
Page 51: ...51 Installing the Hose Covers T 12 min...
Page 57: ...57 Charging the Circuit...
Page 58: ...58 Outline Drawings...
Page 59: ...59 Outline Drawings...
Page 60: ...60 Outline Drawings...
Page 61: ...61...
Page 62: ...62...
Page 63: ...63...
Page 64: ...64...