11
Unpacking and Inspecting the Unit
Unpacking the Unit
1. Open the packaging.
2. Find the unit documentation.
3. Verify that the packaging contains all the accessories indicated on the
list attached with the documentation.
4. Check that the hose length is correct before starting the installation.
Checking can be carried out by consulting the “Packing List” included
with the unit documentation.
Inspecting the Unit
1. Open the condenser unit cover and ensure the following:
•
Neither the cover nor the unit should show any shock damage
or imperfections.
•
The condenser battery should be charged with helium gas.
•
The voltage of all the electrical components is correct (12/24V).
2. Open the evaporator unit cover and make the following checks:
•
Neither the cover nor the unit should show any shock damage
or imperfections.
•
The evaporator battery should be charged with helium gas.
•
The voltage of all the electrical components is correct (12/24V).
Summary of Contents for B-100-10
Page 9: ...9 Required Tools...
Page 13: ...13 Installing the Condenser Unit roof mounted ASA052 T 10 min...
Page 15: ...15 Installing the Condenser Unit roof mounted T 12 min...
Page 17: ...17 Installing the Condenser Unit front mounted T 10 min...
Page 19: ...19 Installing the Condenser Unit front mounted C T 15 min...
Page 21: ...21 Installing the ES100 Evaporator Unit T 20 min...
Page 23: ...23 Preparing Refrigeration Hoses T 10 min...
Page 25: ...25 Connecting Hoses to the Condenser Unit T 10 min...
Page 27: ...27 Connecting Hoses to the ES100 Evaporator T 14 min...
Page 29: ...29 Electrical Connections in the ES100 Evaporator T 10 min...
Page 31: ...31 Drain Circuit in the ES100 Evaporator T 5 min...
Page 33: ...33 Circuit Seal Test...
Page 35: ...35 In Case of Leaks 250 psig...
Page 37: ...37 Installing the In Cab Control 1 3 T 10 min...
Page 39: ...39 Optional Internal DIN Adaptor T 5 min...
Page 41: ...41 Control Cable Connection T 5 min...
Page 43: ...43 Battery Connection T 15 min...
Page 45: ...45 Fitting the Power Supply Units with Electric Standby T 10 min...
Page 47: ...47 Door Switch Connection DSW1 CHW T 1 min...
Page 49: ...49 Installing the Deflector T 5 min...
Page 51: ...51 Installing the Hose Covers T 12 min...
Page 57: ...57 Charging the Circuit...
Page 58: ...58 Outline Drawings...
Page 59: ...59 Outline Drawings...
Page 60: ...60 Outline Drawings...
Page 61: ...61...
Page 62: ...62...
Page 63: ...63...
Page 64: ...64...