20
Installing the ES100 Evaporator Unit
1. Fit the template according to the instructions given.
2. Mark the position of the drilled holes. Avoid any possible interference
with electrical wires and parts of the vehicle chassis.
3. Drill blind holes to screw the evaporator unit in place. Screw in the
bolts and washers supplied for the ceiling. Do not tighten.
4. Cut the hole to route the moisture drain hose (diameter 22).
5. Install the unit on the ceiling supported by the bolts screwed in
previously.
6. Tighten the bolts.
Summary of Contents for B-100-10
Page 9: ...9 Required Tools...
Page 13: ...13 Installing the Condenser Unit roof mounted ASA052 T 10 min...
Page 15: ...15 Installing the Condenser Unit roof mounted T 12 min...
Page 17: ...17 Installing the Condenser Unit front mounted T 10 min...
Page 19: ...19 Installing the Condenser Unit front mounted C T 15 min...
Page 21: ...21 Installing the ES100 Evaporator Unit T 20 min...
Page 23: ...23 Preparing Refrigeration Hoses T 10 min...
Page 25: ...25 Connecting Hoses to the Condenser Unit T 10 min...
Page 27: ...27 Connecting Hoses to the ES100 Evaporator T 14 min...
Page 29: ...29 Electrical Connections in the ES100 Evaporator T 10 min...
Page 31: ...31 Drain Circuit in the ES100 Evaporator T 5 min...
Page 33: ...33 Circuit Seal Test...
Page 35: ...35 In Case of Leaks 250 psig...
Page 37: ...37 Installing the In Cab Control 1 3 T 10 min...
Page 39: ...39 Optional Internal DIN Adaptor T 5 min...
Page 41: ...41 Control Cable Connection T 5 min...
Page 43: ...43 Battery Connection T 15 min...
Page 45: ...45 Fitting the Power Supply Units with Electric Standby T 10 min...
Page 47: ...47 Door Switch Connection DSW1 CHW T 1 min...
Page 49: ...49 Installing the Deflector T 5 min...
Page 51: ...51 Installing the Hose Covers T 12 min...
Page 57: ...57 Charging the Circuit...
Page 58: ...58 Outline Drawings...
Page 59: ...59 Outline Drawings...
Page 60: ...60 Outline Drawings...
Page 61: ...61...
Page 62: ...62...
Page 63: ...63...
Page 64: ...64...