26
Connecting Hoses to the ES100 Evaporator
1. Remove plugs from all tubing.
2. Lubricate all refrigeration intakes with Thermo King refrigerant oil.
3. Place an O-ring on each refrigeration intake.
4. Connect each hose using two fixed wrenches.
The O-ring should be properly positioned before the fitting is
screwed on.
5. Wrap the hoses with thermal
insulation material
(armaflex type) to
prevent water condensation.
6. Hermetically seal all holes where hoses and lock screws pass through.
Summary of Contents for B-100-10
Page 9: ...9 Required Tools...
Page 13: ...13 Installing the Condenser Unit roof mounted ASA052 T 10 min...
Page 15: ...15 Installing the Condenser Unit roof mounted T 12 min...
Page 17: ...17 Installing the Condenser Unit front mounted T 10 min...
Page 19: ...19 Installing the Condenser Unit front mounted C T 15 min...
Page 21: ...21 Installing the ES100 Evaporator Unit T 20 min...
Page 23: ...23 Preparing Refrigeration Hoses T 10 min...
Page 25: ...25 Connecting Hoses to the Condenser Unit T 10 min...
Page 27: ...27 Connecting Hoses to the ES100 Evaporator T 14 min...
Page 29: ...29 Electrical Connections in the ES100 Evaporator T 10 min...
Page 31: ...31 Drain Circuit in the ES100 Evaporator T 5 min...
Page 33: ...33 Circuit Seal Test...
Page 35: ...35 In Case of Leaks 250 psig...
Page 37: ...37 Installing the In Cab Control 1 3 T 10 min...
Page 39: ...39 Optional Internal DIN Adaptor T 5 min...
Page 41: ...41 Control Cable Connection T 5 min...
Page 43: ...43 Battery Connection T 15 min...
Page 45: ...45 Fitting the Power Supply Units with Electric Standby T 10 min...
Page 47: ...47 Door Switch Connection DSW1 CHW T 1 min...
Page 49: ...49 Installing the Deflector T 5 min...
Page 51: ...51 Installing the Hose Covers T 12 min...
Page 57: ...57 Charging the Circuit...
Page 58: ...58 Outline Drawings...
Page 59: ...59 Outline Drawings...
Page 60: ...60 Outline Drawings...
Page 61: ...61...
Page 62: ...62...
Page 63: ...63...
Page 64: ...64...