INSTALLATION
6
2.3 WELD OUTPUT CONNECTIONS (continued)
Install the supplied male connectors onto proper cables as follows
(refer to Figure 2-A below):
1. Obtain cable of desired length and proper size for installation
(see Table A, page 5).
2. If the installation requires cable larger than 3/0 AWG, pre-
pare one end of 3/0 AWG pigtail no longer than 2 ft (0.61 m)
for connector installation. The remaining end of the pigtail is
connected to the main run of 3/0 AWG or larger weld cable.
3. Push weld cable through insulator as shown in Figure 2-A.
4. Remove 1 in (25 mm) of insulation from end of cable.
5. Install supplied sleeve on stripped end of cable.
6. Insert cable with sleeve into connector body so that cable is
snug and against bottom of connector body.
7. Install and tighten set screw with supplied hex wrench to
secure connector body onto cable.
8. Push insulator onto connector body to cover set screw.
Connector Installation
ELECTRIC SHOCK
can kill. ARCING can burn skin or damage
electrical connections.
• Do not touch live electrical parts.
• Shut down unit before making any weld output connections.
• Do not change position of the welding cable connectors while
welding.
• Be sure the connectors are secure in receptacles before welding.
WARNING
Weld Cable Connections
Figure 2-A
Connector Installation
Strip insulation
approx. 1 in from end
Insulator
Weld Cable
Sleeve
Set Screw
Connector Body
(Male or Female)
A-00033