22
WATER CHILLER FINAL INSTALLATION
1
Take the water chiller out of its packaging and install the cover on top of the unit.
The hood allows you to choose the direction of hot air exit. Orient the hot air out-
let so that the heat emitted easily dissipates into the room.
2
Place the water chiller on the floor under the
control box.
Summary of Contents for CUBE LT
Page 1: ...CUBELT User Manual...
Page 2: ...DESIGNED AND MADE IN CANADA...
Page 52: ...50 APPENDICES...
Page 55: ...53 PARTS LIST...
Page 58: ...56 NOTES...
Page 60: ...WWW THEWINESQUARE COM The Wine Square 2022 All rights reserved R0 0...