en-58
7 OPERATION
7.1 DAILY INSPECTION ____________________________________________________
1.
Perform a visual inspection of the entire unit, look for signs of wear, loose hardware and missing or
damaged components. Check for fuel and oil leaks to ensure connections are tight and hoses and
tubes are in good condition.
2.
Check the fuel supply, radiator coolant level, crankcase oil level and air cleaner is clean. All fluids must
be at the full mark with the engine cold.
3.
Make sure all cutting units are adjusted to the same height of cut.
4.
Check all tyres for proper inflation.
5.
Test the operator presence and safety interlock system.
CAUTION
The Daily Inspection Must Be Performed Only When The Engine Is Off And All Fluids
Are Cold. Lower Implements To The Ground, Engage Parking Brake, Stop Engine
And Remove Ignition Key.
Summary of Contents for Jacobsen Ransomes Parkway 3 Meteor LGNN344
Page 8: ...en 8 2 INTRODUCTION NOTES...
Page 33: ...en 33 SPECIFICATIONS 4 NOTES...
Page 87: ...en 87 MAINTENANCE LUBRICATION 8 NOTES...
Page 99: ...en 99 ADJUSTMENTS 9 NOTES...
Page 115: ...en 115 QUALITY OF CUT 12 NOTES...
Page 119: ......
Page 126: ...nl 8 2 INLEIDING OPMERKINGEN...
Page 151: ...nl 33 TECHNISCHE GEGEVENS 4 OPMERKINGEN...
Page 215: ...nl 97 AFSTELLING 9...
Page 231: ...nl 113 MAAIKWALITEIT 12...
Page 235: ......