6 Recovery and transport of the machine
64
TW85
6.2 Loading the machine using a crane
The weight equals 9.5 t.
Use a crane with sufficient lifting load
capacity!
To load the excavator using a crane, the following
activities must be carried out:
•
Empty and fold in the bucket.
•
Position the work equipment straight ahead.
•
Turn the upper carriage to driving position (work
equipment is above the steering axle).
•
Lock the uppercarriage using the slewing lock
(50/21).
•
Raise the boom.
•
Retract intermediate boom cylinder (only TPA
and CI).
•
Retract the dipperstick.
•
Switch off the engine.
•
Leave the excavator and close the doors.
•
Attach the excavator to the 3-point lifting gear at
the points illustrated (fig. 49) in the correct
manner.
6.3 Transporting the machine
When transporting the machine on flat bed trailer
or by rail, etc. it must be lashed down according to
good practice at the marked points (fig. 51) and
secured with wedges; the support legs (and/or
dozer blade) and the working equipment must be
lowered to the ground.
Be aware of the total transport height.
Risk of accident when driving in
tunnels, under bridges, etc.!
Main dimensions Transport position
A B C
6,300 mm
2,450 mm
2,930 mm
1
2
HM32-049
Fig. 49 Loading the machine using a crane
HM32-050
21
Fig. 50 Uppercarriage locking
HM32-051
A
B
C
Fig. 51 Lashing for transport
Summary of Contents for TW85
Page 6: ...Table of contents TW85...
Page 112: ...7 Maintenance and care 106 TW85...
Page 125: ...Powered by TCPDF www tcpdf org...