![Terex TW85 Operating Instructions Manual Download Page 52](http://html1.mh-extra.com/html/terex/tw85/tw85_operating-instructions-manual_1088809052.webp)
4 Operation
46
TW85
4.7.3 Brakes
Service brake
•
Operate the service brake (20/12) as required.
Parking brake
•
The parking brake (20/63) must be activated
when shutting off the machine.
Activate brake only when machine is
at standstill.
Excavator brake
•
The excavator brake – push the service brake
(20/12) fully through until fastening device
(20/11) locks in – must be engaged during
excavation work.
The pendulum axle is simultaneously
locked with the excavator brake.
4.7.4 Driving on roads
Buckets with a width over 600 mm, ditch-
cleaning buckets/swing buckets with a
width of more than 1,250 mm must be
removed.
•
Swing upper carriage to travel position and peg
out with upper carriage swing lock bolts (20/21)
•
TW85 AL
– Set to "normal steering" (see
Chapter 4.7.2 Steering)
•
Boom up until color marking on the slewing
column is covered.
•
Raise the boom (TPA, CI) completely.
•
Swivel work device to transport position with
backsight (21/1)
•
Retract intermediate boom cylinder (TPA and
CI) completely
P
HM32-020-N
52
62 63
11
12
16
21
Fig. 20 Operation
HM32-020
Fig. 21 Backsight
Summary of Contents for TW85
Page 6: ...Table of contents TW85...
Page 112: ...7 Maintenance and care 106 TW85...
Page 125: ...Powered by TCPDF www tcpdf org...