First Edition • Third Printing
Operator's Manual
Operating Instructions
Part No. 1270327GT
SX
™
-105 XC
™
• SX
™
-125 XC
™
59
Observe and Obey:
Pipe cradles must be installed on the inside of
the platform.
Pipe cradles must not obstruct the platform
controls or the platform entrance.
The bottom of the pipe cradle tube must rest
on the platform floor.
Be sure the platform is level before installing a
pipe cradle.
Pipe Cradle Installation
1
Install a pipe cradle on each side of the
platform. Refer to the illustration on the left.
Make sure the bottom of the pipe cradle tube
rests on the platform floor.
2
Install two U-bolts from the outside of the
platform rails through each pipe cradle mount.
3
Secure each U-bolt with 2 washers and 2 nuts.
Pipe Cradle Operation
1
Be sure the pipe cradle assembly and
installation instructions have been followed
properly and that the pipe cradles are secured
to the platform railings.
2
Place the load so that it rests in both pipe
cradles. The length of the load should be
parallel with the length of the platform.
3
Center the load in the pipe cradles.
4
Secure the load to each pipe cradle. Pass the
nylon strap over the load. Depress the buckle
and slide the strap through. Tighten the strap.
5
Gently push and pull on the load to make sure
the pipe cradles and load are secure.
6
Keep the load secured when the machine is
moving.
Tip-over hazard. The weight of the pipe cradle
assembly and the load in the pipe cradles will
reduce the rated platform capacity of the
machine and must be factored into the total
platform load.
Tip-over hazard. The weight of the pipe cradle
assembly and the load in the pipe cradles may
limit the maximum number of occupants in the
platform.
Maximum Pipe Cradle Capacity
All models
90.7 kg
Pipe Cradle Assembly Weight
9.5 kg
Summary of Contents for Genie SX-105 XC
Page 76: ......