T-Core
User Manual
46
January 14, 2020
o
Now, you should now be able to observe the green LEDs are blinking.
o
Recycle the power, you can also observe the green LEDs are blinking as the demo program
is loaded from QSPI Flash. After the reset operation, the RISC-V core will execute the
demo program. You can program new software into board with the SDK, but the FPGA
image will not be modified.